SharePoint Online Migration Checklist: A Step-by-Step Plan for US Businesses

SharePoint Online migration checklist with seven phases by TSinfo Technologies

Your shared drives are full, old SharePoint sites nobody owns are still running, and half the team keeps files in Dropbox. Everyone agrees it is time to move.

The hard part is moving without breaking permissions, links and the processes people rely on.

Quick answer: a good sharepoint online migration checklist runs in seven phases: discover and assess, plan the information architecture and permissions, clean up, pilot, migrate in waves, validate, then drive adoption and retire the old system.

Microsoft’s free tools, Migration Manager and the SharePoint Migration Tool, handle the copying; the planning is on you.

What You Can Migrate to SharePoint Online

We migrate from almost anything to SharePoint Online. If you are still deciding whether the cloud fits, our comparison of SharePoint Online and on-premises SharePoint covers the trade-offs.

Microsoft offers two free tools, and the source decides which one you use:

SourceMicrosoft toolNotes
Windows file sharesMigration Manager or SPMTMigration Manager scales with multiple agents; source must support SMB 2.0 or higher
SharePoint Server 2010, 2013, 2016, 2019 and SharePoint Foundation 2010, 2013SharePoint Migration Tool (SPMT)Can also move some classic workflows to Power Automate
Google Workspace, Box, Dropbox, EgnyteMigration ManagerBuilt into the SharePoint admin center
Amazon S3 or Azure Blob storageNot supported by Migration ManagerPlan a partner tool or a staged copy

Both tools copy content; your source files are not deleted. That gives you a safe rollback window, but it also means you must plan when the old system becomes read-only.

Phase 1: Discover and Assess

You cannot plan what you have not measured. Start with an inventory and a list of known problems before anyone picks a cutover date.

  • List every source: file servers, SharePoint farms, cloud drives and the business owner of each.
  • Capture total size, file counts, the largest folders and the deepest folder paths.
  • Run a scan: SPMT and Migration Manager both scan before they migrate. For older farms, the SharePoint Migration Assessment Tool (SMAT) flags issues.
  • Inventory customizations: classic workflows, InfoPath forms, custom code and classic pages.
  • Note files that break SharePoint rules, covered in the limits table below.

Most teams find that a large share of the data has not been opened in years.

That finding drives Phase 3, and it is exactly where a SharePoint consulting and migration team saves the most time.

Phase 2: Plan Information Architecture and Permissions

Do not recreate your old drive letters in the cloud. Map each department or project to a site, then group related sites under hub sites.

Microsoft recommends hub sites over subsites, and every navigation level is limited to 500 child links. A clear structure is also the foundation of good document management in SharePoint.

  • Decide what becomes a team site (collaboration) and what becomes a communication site (publishing).
  • Replace deep folders with libraries, metadata columns and views where it helps.
  • Build permissions on Microsoft 365 groups and site roles, not on individual users.
  • Keep unique permissions rare. Microsoft supports 50,000 per list or library but recommends staying near 5,000.
  • Write a mapping sheet: every source path, its target site and library, and its owner.

If you are new to how sites, libraries and Microsoft 365 groups fit together, our guide on what SharePoint Online is and how it works is a good primer.

Phase 3: Prepare and Clean Up the Source

Every file you skip is a file you never have to validate. Archive or delete stale content with the business owner’s sign-off, then fix the items that will fail.

SharePoint Online limitValue (Microsoft Learn)What to do before migrating
File upload size250 GB per fileFind oversized files such as old backups and media exports
Total path length400 characters for the decoded path, including the file nameFlatten deep folders and shorten long names
Invalid characters” * : < > ? / \ | and leading or trailing spacesRename, or let the tool report and fix them
Reserved names.lock, CON, PRN, AUX, NUL, COM0-COM9, LPT0-LPT9, desktop.ini, _vti_Rename or exclude
List view threshold5,000 items per viewPlan indexed columns and filtered views for large libraries
Breaking inheritanceNot allowed on a list, library or folder with more than 100,000 itemsSet folder permissions before the library grows
Sync recommendationNo more than 300,000 files synced in one libraryAvoid one giant library that everyone syncs

For ideas on structuring libraries before you fill them, see our SharePoint document management best practices.

Phase 4: Run a Pilot

Pick one department with real but manageable content, ideally with a few ugly folders. Migrate it end to end and treat it as a rehearsal.

  • Measure throughput so you can estimate the remaining waves realistically.
  • Review the tool reports for failed, skipped and renamed files.
  • Have pilot users check permissions, version history, metadata and their most-used files.
  • Collect feedback on the new structure and adjust the mapping sheet before scaling up.

Pilots also expose network bottlenecks. For very large file shares, Microsoft supports shipping data on Azure Data Box and then using SPMT to finish the move.

Phase 5: Migrate in Waves

Group content by department or business process, not by server. Each wave follows the same rhythm, which keeps support load predictable.

  1. Announce the wave date and the new location to affected users.
  2. Run the initial copy during business hours or overnight, depending on load.
  3. Run incremental passes to pick up files changed since the first copy.
  4. Set the source to read-only at cutover and run the final pass.
  5. Redirect mapped drives, shortcuts and links to the new sites.

Give migration staff only the access they need. Microsoft now offers a Migration Administrator role for Migration Manager, so the team does not need full SharePoint admin rights.

Phase 6: Validate Content, Permissions and Workflows

Do not sign off a wave based on a green progress bar. Compare file counts and sizes against the source and spot-check the folders with known issues.

Workflows need their own check. SharePoint 2010 workflows were retired in November 2020, and SharePoint 2013 workflows were fully retired for existing tenants on April 2, 2026, so none of them run in SharePoint Online.

SPMT can convert SharePoint 2010 out-of-the-box workflows and SharePoint Designer 2010 and 2013 workflows into Power Automate flows. It moves definitions and associations, not workflow history, and it skips site workflows.

Complex approvals usually need a proper rebuild by a Power Automate development team. Old custom code and classic web parts are a job for SharePoint Framework development.

Phase 7: Adopt, Govern and Decommission

A migration is finished when people stop asking for the old drive. Train site owners, publish a short “where things live now” page, and keep a help channel open for the first weeks.

  • Assign at least two owners per site and review access quarterly.
  • Set sharing and retention policies before content starts growing again.
  • Keep the source read-only for an agreed period, then archive and decommission it.

Many companies use the migration to launch a proper SharePoint intranet home for employees, which gives people one front door to the new sites.

Common Mistakes to Avoid

  • Lifting and shifting dead data. It slows every wave and clutters search.
  • Copying permissions sprawl. Years of one-off folder shares pile up as unique permissions that nobody can audit.
  • Ignoring workflows until after cutover. Classic SharePoint workflows no longer run online, so rebuild them first.
  • Recreating the folder tree. Deep nesting hits the 400-character path limit and makes files harder to find.
  • Skipping the pilot. Throughput and naming problems show up in week one instead of the night before go-live.
  • No owner per site. Without an owner, a new site drifts the same way the old file share did. Our list of common SharePoint site owner mistakes shows what to watch for.

Next Steps

Start with Phase 1 this week: list your sources, their owners and their size. That inventory alone turns a vague project into a plan you can schedule.

If you want help building the plan or running the waves, book a free migration consultation and we will review your sources and suggest a realistic approach.

Frequently Asked Questions

How long does a SharePoint Online migration take?

It depends on data volume, file counts, network speed and how much cleanup you do first. A pilot gives you real throughput numbers to estimate the remaining waves.

Is the SharePoint Migration Tool free?

Yes. Microsoft provides both the SharePoint Migration Tool and Migration Manager at no extra cost for moving content into Microsoft 365.

Does migrating to SharePoint Online delete my original files?

No. Migration Manager and SPMT copy content, so the source stays in place. Set it to read-only at cutover and decommission it once validation is done.

What happens to SharePoint 2013 workflows during migration?

They do not run in SharePoint Online; Microsoft fully retired them for existing tenants on April 2, 2026. Convert simple ones with SPMT and rebuild the rest in Power Automate.

Can I migrate from Google Drive, Box or Dropbox to SharePoint?

Yes. Migration Manager supports Google Workspace, Box, Dropbox and Egnyte. See Microsoft Learn: Migrate to Microsoft 365.